Update the status of stories and subtasks on the Scrum board
You can change the status of a story directly from the agile story board to reflect how the stories are progressing through the iteration or project.
Access requirements
You must have the following access to perform the steps in this article:
table 0-row-2 1-row-2 layout-auto html-authored no-header | |
---|---|
Adobe Workfront plan | Any |
Adobe Workfront license |
New: Standard or Current: Work or higher |
For more detail about the information in this table, see Access requirements in Workfront documentation.
Update the status of a story or subtask
-
Click the Main Menu icon
-
(Optional) Click the Switch team icon
-
Navigate to an active iteration.
-
Drag a story from one status column on the story board into another column.