Fourth Quarter 2024 Project enhancements

This page describes all project enhancements made with the Fourth Quarter 2024 release to the Preview environment. These enhancements will be made available in the Production environment as noted.

For a list of all changes available at this point in the Fourth Quarter 2024 release cycle, see Fourth Quarter 2024 release overview.

More relevant assignments added to the New Task workflow

NOTE
Preview release: February 13, 2024; Production for fast release: With the 24.5 release (May 16, 2024).
This feature will be removed from Preview on December 19, 2024 and from fast release Production with 25.1 (January 2025).

We have added the same functionality for more relevant smart assignments to the Assignments field in the following areas:

  • The New Task box when adding a task to a project

  • In a project task list

For more information, see Smart assignments overview.

More relevant smart assignments

NOTE
Preview release: December 21, 2023; Production for fast release: With the 24.5 release (May 16, 2024).
This feature will be removed from Preview on December 19, 2024 and from fast release Production with 25.1 (January 2025).

We have changed the algorithm that Workfront uses to calculate and suggest smart assignments for tasks. The new algorithm applies in the following areas in Workfront where you assign a task: task lists, the Assignments area in the task header, Home, and the Summary panel.

Now, the algorithm looks at the following information when it suggests smart assignments:

  • Similarities between task, project, and portfolio names.

  • Frequency with which an assignment is made to a task with a similar name.

If the new algorithm finds no matches, the existing criteria for calculating smart assignments are applied.

Also consider the following:

  • The name of the smart assignments list in a task list changed in the task list from “Here are a few suggestions” to “Suggested assignments”.

  • There are no changes in the way smart assignments are calculated for issues. The name of the smart assignment list in an issue list is “Here are a few recommendations”.

For more information, see Smart assignments overview.

recommendation-more-help
5f00cc6b-2202-40d6-bcd0-3ee0c2316b43