Move issues
You can move issues between the following objects:
- From a project to another project
- From a task to another task in the same project or in another project
- From a task to the project or to another project
- From a project to a task in the same project or a task in another project
Access requirements
You must have the following access to perform the steps in this article:
*To find out what plan, license type, or access you have, contact your Workfront administrator.
Considerations about moving issues
Consider the following when moving issues that contain documents or are associated with a request queue:
- When an issue is associated with a requests queue: When you move an issue to another object and the issue is associated with a request queue, the moved issue is no longer associated with the original queue the first issue originated from.
- When a document is attached to the issue: When you move an issue to another object and the issue has a document attached to it, the document, its versions and proofs also move to the new issue. Any approvals associated with the document do not move.
- When an issue is linked to a document or a folder: When you move an issue which has documents or folders linked to a a third party service like Google Drive, the links to the documents move with the issue.
Move issues in a list
You can move one or multiple issues from a list of issues or from an issue report.
-
Go to the project that contains the issue or issues that you want to move.
Or
Go to an issue report.
-
If you selected to go to a project, click Issues in the left panel.
-
Select the issue or issues that you want to move and click the More menu at the top of the issue list, then click Move to.
-
Continue with moving the issue, as described in the section Move a single issue starting with Step 2.
Move a single issue move-a-single-issue
You can move one issue when viewing it.
Move a single issue in the Preview environment
-
Go to an issue that you want to copy, click the More menu to the right of the issue name, then select Move to.
The Move Issue box displays.
-
In the Select Destination Project section, specify the name of the project where you want to move the issues. The name of the current project displays by default.
note tip TIP Only 100 projects display in the list. -
(Conditional) Click request access if you do not have access to move issues to the project.
-
(Conditional) Continue to move the issue on the selected destination project without requesting access if you have access to add issues to one of the tasks on the destination project.
note tip TIP Similar messages display if the project selected is in pending approval, completed, or dead, when the Workfront administrator prevents adding issues to these projects. For more information, see Configure system-wide project preferences. -
(Optional) In the Options section, deselect any of the items listed in the table below to remove them from the moved issue. All options are selected by default.
note important IMPORTANT Deselecting items in the Options list results in loss of data. Information from the existing issue will be removed and cannot be recovered. table 0-row-2 1-row-2 2-row-2 3-row-2 4-row-2 5-row-2 layout-auto html-authored no-header Select all Deselect this option to remove all information from the issue when moving it to its new location. Assignments Removes users, job roles, or teams that are assigned to the issue. Progress Removes the percent complete, if any, of the issue. Documents Removes everything in the documents tab, including document versions, linked documents, and folders.
NOTE
If you opt to not have the documents moved with the issue, the documents will be deleted and placed in the Recycle Bin for 30 days. An administrator can restore them and they will be restored on the moved issue.
If the issue is deleted after it’s moved, the restored documents will be placed in the Documents area of the user page of the administrator who restores them.
Permissions Removes the entities that the issue is shared with. Updates Removes comments from the Updates section of the issue. -
(Optional) In the Select Task section, select the task where you want to move the issue.
-
Click Move issue or Move issues, if you selected multiple issues in a list.
The moved issues are added to the specified project.