Considerations when logging time in Workfront

  • You can log time for projects, tasks, or issues, or you can log time directly in your timesheet.

    For information about creating timesheets, see Create a single-use timesheet.

  • All time logged through tools other than the timesheet appear in the timesheet for the corresponding time period.

  • Tasks and issues on a project that is not current are not pre-populated into a timesheet.

  • Time logged in the timesheet is immediately applied to the task, issue, or project.

  • Timesheets include the total time for all logged dates. Weekends are always included, even when timeline calculations have been configured to exclude them (as described in Configure system-wide project preferences).

  • The maximum number of items displayed in a timesheet is 45. If there are more than 45 items whose dates match the timesheet time frame, only the most recently updated items display.

  • Hour entries that are included in billed billing records are dimmed and cannot be edited in the timesheet. For more information, see Create billing records.

  • Personal tasks do not display in the timesheet by default. Personal tasks display in the timesheet only when they have time logged. After you log the time on a personal task, you can pin the task to the timesheet and it will remain on the timesheet if it remains pinned. For more information, see Create work items and projects from the Home area.