Automated Workflow diagrams

While setting up the workflow for your proof, you will notice a diagram being created. Every stage you add to your proof will appear in the diagram, clearly indicating the dependencies between the stages. Private stages are marked with a key icon.

The diagram floats, which means that it will remain visible even if you scroll down the page.

If you don’t need to see the diagram, you can hide it (1).

Diagram.png

Add a stage

You can add an additional stage to a workflow you are creating or modifying.

  1. If you are adding a stage to an existing proof, go to the Proof details page, as described on Manage Proof Details in Workfront Proof.

  2. In the Workflow section, click New stage.

  3. Specify information for the stage as in step 4 under the Creating a Proof with an Automated Workflow section in this article.

  4. Click Add stage, then click Done.

Delete a stage

  1. Click the trash icon available in the top right corner of the stage (1).
    The icon appears when you hover over the stage.
    deleting_a_stage.png

Stage settings

  • Stage name: Appears on the Workflow diagram and is included in the email notifications sent to reviewers.

  • Activate stage: For each stage of your Workflow, you can decide when it should be activated. For your first stage, the following options will be available:

    • On proof creation
    • On a specific time and date
    • Manually
    • Only these three options are available for your first stage. The other options will become available when you add a second stage; they require you to select a parent stage.
    • After previous deadline is reached (requires picking a parent stage)
    • All decisions are Approved or Approved with changes (requires picking a parent stage)
    • All decisions are Approved (requires picking a parent stage)
    • All decisions are made (requires picking a parent stage)
  • Deadline: You can decide how the deadline should be calculated on each stage of a workflow. The options are:

    • From proof creation: In the deadline field (9) you can select the deadline date for the proof.
    • From stage activation: In the deadline dropdown you select the number of business days that will be added to the stage activation date to automatically set a deadline on the proof.
  • Lock: There are a number of options that determine when a stage can be locked. The options include:

    • Manual lock
    • Never
    • When the next stage starts
    • When all decisions are made

Primary decision maker: You set the Primary decision maker on the stage. The available decision makers appear in the list only after you’ve added the reviewers to the stage.

NOTE
If you pick a Primary decision maker, only one decision required option will no longer be available on this stage.
  • Only one decision required: You can enable this option on a stage. This means that the review will be completed once one of the decision makers makes their decision.
  • Privacy: Each stage can be made private. If a stage is private, the comments and decisions won’t be visible to people who are not added to this stage or are not Supervisors, Administrators or Billing Administrators in the account. For more information, see Automated Workflow overview .

Add reviewers to a stage

  1. Enter a contact name or email address in the field at the bottom of each stage.

  2. Click on the green plus icon to add them.

  3. Set the role on the proof.

  4. Set the email alert.

  5. When setting up the first stage, you also have the option to change the Owner of the proof.

    NOTE
    • A reviewer can be added to a proof only once. You cannot add the same person to more than one stage on the proof.
    • Reviewers who are not added to a private stage cannot see the stage on the proof or comments made in that stage.

Convert a proof to an Automated Workflow

You can convert a basic proof to Automated Workflow.

  1. Click Convert to Automated Workflow on the Proof details page.
    After the proof is reworked to Automated Workflow, all stages are active, public and their Lock stage option is set to Manual by default. All stages remain with users and their settings.

    • Activate stage is set to On proof creation in every stage.
    • Deadline calculated from option is set to Proof creation in every stage.
    • If only one decision option was selected on the basic proof, all stages have it selected.
    • If on basic proof Primary decision maker was selected then stages with that recipient are set to them and all other have it set to None.
    • Stage name remains the same.

Add an additional template to an existing Automated Workflow

After a basic proof is converted to Automated Workflow, you can add additional template to it.

  1. On the Proof details page, in the Workflow section, click Add template.

    • Template settings determine what can be done with a proof to which this template was added. For example, if the template has the Add a stage and Add people to stages options disabled, buttons to add stage and share proof will not be visible.

    • If Add a stage option is disabled in the given template, after adding it the Add template button are not visible.

    • When a person is added to a stage in an Automated Workflow template, but also already present on the proof then if this template is applied, the system will remove this person from the stage automatically. If there is no one else added to this particular stage, the following error will be shown, as the system will not allow to add an empty stage to the workflow.

      error_when_adding_template.png

Previous pageAutomated Workflow in Workfront Proof
Next pageManage a proof configured with an Automated Workflow in Workfront Proof

Workfront