Create tasks
Last update: March 17, 2025
- Topics:
- Work Management
CREATED FOR:
- Beginner
- User
The video provides a tutorial on creating tasks in a Workfront project, covering both the long method and handy shortcuts. It emphasizes flexibility in task creation and provides tips for efficient task management.
Transcript
Create Tasks. In this video you will learn the long way to create a task in a work front project, and a few handy shortcuts for creating tasks. There’s a lot to know about using tasks in your project. This tutorial is just about creating tasks. There are several other tutorials that will get into the finer details about using tasks. I’ll start with a simple project where I already added some tasks. Now let’s add some more. The long way to create a task. The long way to add tasks is with the new task button. It’s not really that long, but it can be if you need it to be. So for right now we’ll add a name. That’s a required field. Description is optional but a good idea. Other things like the duration. Most of the time when you’re first building out a project, you don’t know all those things. If you do, go ahead and put them in. But there’s plenty of time to do that later. If you want to get into the additional options, you can click on more options here. And now we’ve got some basic information. The status is new to start with by default. There are no more required fields, just the task name. So all these others are optional and can be added as you need them. There’s a lot of tutorials, like I said, that will get into more details about other fields here. But we’ll just scroll past them so you’ll see how long this is. And then we can click on create task when we’re ready to create it. We successfully created the task and it adds it to the bottom of the list. And from here we can move it up to another place if we want to. Just click and drag and we can move it up and if we hesitate a little bit, then you see how that task four became highlighted. If I let go now, what I was telling Workfront is that I want this to be a subtask of task four. If I didn’t want it to be a subtask of task four and I just was dwelling there a little longer than I realized and suddenly it became a subtask. Then I can easily make it not a subtask by clicking Outdent. Now I’ve brought it back to the same level as the other tasks. What I really wanted to do was put it up at the top, so I’m going to do that again. And there we go. We can reposition any tasks that way. Okay, now for some handy shortcuts. There’s an add more tasks button here at the bottom. I can click that and the easy thing about this is it brings me right to the task name, which is the required field, and I can type in the task name. Now if I just hit enter here, I’m brought to a place where I can add another task. If I want to tab over, I can make my assignment right here. I can add any other things that I might want to. I can click down on this area to save it. So using inline edit is great help to quickly put in tasks. The fields that are available here, the task name, assignments, these are all of course only a few of the fields that we saw in the new task button. So there’s a bunch of different views that show different fields depending on kind of what you want to put in here or what you want to see in your view and also what you want to have available to you when you’re adding new tasks. Suppose I wanted to add a description field when I was adding new tasks. I would choose a different view here that has a description field in it. Additional information. And then as I’m adding tasks, or even after I’ve added the task, I can quickly go in here and put in a description. Now when I add tasks with the add more task button, you notice that they all go at the bottom here. So again, I can click and drag them up to another place if I want to. Now if I want to put a task in a certain position to start with, I can always go to the place I want to put it in. Let’s say I want to put a new task between task five and task six. I can right click here. It selects that when I do. And then I can choose insert task below. Now I’ve got that other task. Can hit enter to save it. And it’ll keep adding more tasks until I decide that I’m done. So that’s the basics of creating tasks.
Key takeaways
- Task Creation Methods: Use the “New Task” button for detailed task creation or the “Add More Tasks” button for quick inline editing.
- Required Fields: Only the task name is mandatory; other fields like description, duration, and assignments are optional and can be added later.
- Repositioning Tasks: Tasks are added to the bottom of the list but can be repositioned by dragging or using the “Outdent” option to adjust hierarchy.
- Custom Views: Different views can be selected to include additional fields, such as descriptions, while adding tasks.
- Inserting Tasks at Specific Positions: Right-click between existing tasks and select “Insert Task Below” to place a new task in a specific location.
Recommended tutorials on this topic
Previous pageUnderstand the Board view
Next pageUnderstand parent-child tasks
Workfront
- Workfront Tutorials
- Administration and Setup
- Organizational setup
- Manage deleted items
- Configure system defaults
- Layout templates
- What are layout templates?
- Find layout templates
- Customize terminology with layout templates
- Customize the Main Menu with layout templates
- Add and manage pins through a layout template
- Customize Home with layout templates
- Assign and manage access to layout templates
- Customize object areas with a layout template
- Customize project details with layout templates
- Customize project headers with layout templates
- Customize reporting lists with layout templates
- Email and In App Notifications
- Create and manage users
- Approval processes and milestone paths
- System performance and maintenance
- Project finances
- Custom Data
- Custom Forms
- Calculated expressions
- Get started with calculated fields and expressions
- Learn the data expression structure
- Understand Date & Time and Mathematical expressions
- Create ADDDAYS, ADDWEEKDAY, ADDMONTHS, ADDYEARS expressions
- Use the Calculation Editor
- Create DATEDIFF and WEEKDAYDIFF expressions
- Create a SUB, SUM, DIV, or PROD data expression
- Use the CONCAT expression in a calculated field
- Create LEFT/RIGHT expressions
- Use the ISBLANK and CONTAINS expressions
- Create an IF text expression
- Things to know about calculated field expressions
- Manage work
- Projects
- Understand basic project creation
- Navigate the project page
- Learn four ways to create a project
- Fill in the project details
- Get started planning a project
- Take a project live
- Get started managing a project
- Find projects
- Share a project
- Understand the project team
- Understand project communication
- View project information
- Track overall project progress
- Track work progress with project metrics
- Understand the Gantt view
- Understand the Board view
- Tasks
- Issues/requests
- Request queues
- Portfolios
- Approval processes and milestone paths
- Create and manage project templates
- Project timelines
- Close a project
- Project finances for users
- Intermediate projects
- Projects
- Reporting
- Basic reporting
- Understand reporting elements
- Understand reporting components
- Create a basic grouping
- Create a basic view
- Add basic conditional formatting to a view
- Create a basic filter
- Understand the new filter experience
- Create basic filter activities
- Create a simple report
- Create a task report
- Copy a report
- Create reports with charts
- Create a matrix report
- Create dashboards
- Send and share reports
- Understand report settings
- Intermediate reporting
- Create filters with user-based wildcards
- Create filters with date-based wildcards
- Create OR statements in filters
- Understand built-in project filters
- Understand built-in task filters
- Understand built-in issue filters
- Understand basic text mode for filters
- Understand basic text mode for views
- Understand basic text mode for groupings
- Create custom prompts
- Advanced reporting
- Calendar reports
- Basic reporting
- Manage resources
- Workfront Goals
- Workfront Planning
- Integrations
- Adobe Creative Cloud
- Adobe Experience Manager Assets Essentials
- G Suite
- Jira
- Microsoft Outlook
- Microsoft Teams
- Adobe Workfront for Microsoft Teams Overview
- Install Adobe Workfront for Microsoft Teams
- Access Adobe Workfront from Microsoft Teams
- Search for and share Adobe Workfront items in Microsoft Teams
- Create Adobe Workfront tasks from Microsoft Teams
- Submit Adobe Workfront requests from Microsoft Teams
- Manage Adobe Workfront notifications in Microsoft Teams
- Slack
- Fusion
- Welcome to Workfront Fusion
- Understand the basics
- Initial scenario design walkthrough
- Initial scenario design exercise
- Mapping panel and formula editor
- Mapping panel important notes
- Beyond basic mapping walkthrough
- Beyond basic mapping exercise
- Use filters
- Filters walkthrough
- Filters exercise
- Access previous versions walkthrough
- Access previous versions exercise
- Universal connectors and routing
- Universal connectors exercise overview
- Introduction to universal connectors walkthrough
- Introduction to universal connectors exercise
- Understand routers
- Routers walkthrough
- Routers exercise
- Common routing patterns
- Routing patterns walkthrough
- Routing patterns exercise
- Set-it and get-it
- Get/Set variables walkthrough
- Set/Get variables exercise
- Iteration and aggregation
- Execution history and scheduling
- Beyond basic modules
- Data structures and data stores
- Final functional bits and bobs
- Troubleshooting and error handling
- Workfront Fusion administration
- Design optimization and testing
- Workfront Proof
- Learn the benefits of proofing
- Understand the difference between a document and a proof
- Proofing viewers explained
- Administration and setup
- What is an automated workflow template
- Customize proof comment actions
- Customize proof decision options
- Understand email alerts and proof notifications
- Proof roles and email alerts
- Report on proofs
- Set default at risk proof settings
- Set up global proof settings
- Set default proof roles
- Set up proof account default settings
- Settings for proof users
- Upload proofs
- What is a proof version
- Who uploads the proof versions
- Convert a document to a proof
- View and compare proof versions
- Upload a proof version
- Manage proof versions
- Upload a proof of a video
- Upload a proof of a website
- Upload a proof with a basic workflow
- Upload a proof with an automated workflow
- Upload with a drag and drop
- Combine multiple files into a single proof
- Proof workflows
- Review and approve work
- Workfront DAM
- System setup
- Metadata and keywords
- Brand Connect customization
- Workfront DAM user: Contributor
- Understand Workfront DAM as a contributor
- Understand asset management as a contributor
- Understand finding assets as a contributor
- Understand lightboxes as a contributor
- Understand metadata and keyword best practices
- Work with assets as a contributor
- Send a file as a contributor
- Publish assets as a contributor
- Add a Workfront DAM link
- Brand Connect user
- Home
- Agile
- Best Practices
- Agile
- API Explorer
- Business case and portfolio optimizer
- Communication
- Custom forms
- Custom reports
- Dashboards
- Documents
- Filters, views, and groupings
- Job roles
- Layout templates
- Licenses and access levels
- Onboarding and adoption
- Organization units
- Portfolios and programs
- Preview sandbox
- Project, task, and issue preferences
- Project templates
- Proofing
- Request queue
- Resource Planner
- Resource pools
- Scenario Planner
- Schedules
- Statuses
- System performance and maintenance
- Text mode reporting
- Timeline planning and management
- Timesheets and logging time
- Utilization
- Workfront Goals
- Workload Balancer
- Workfront for executives