Scheduled changes for catalog price rules
The Scheduled Changes box appears at the top of the page when a new price rule is saved or updated. Catalog price rules can be applied on schedule as part of a campaign and grouped with other content changes. You can create a campaign based on scheduled changes to a price rule, or apply the changes to an existing campaign.
If there are multiple price rules running in the same campaign, the Priority setting of the price rule determines which rule takes precedence. To learn more, see Content Staging.
{width="600" modal="regular"}
Schedule an update to a catalog price rule
-
On the Admin sidebar, go to Marketing > Promotions > Catalog Price Rule.
-
Open the rule in edit mode.
-
In the Scheduled Changes box at the top of the page, click Schedule New Update.
-
With the Save as a New Update option selected, do the following:
-
For Update Name, enter a name for the update to the rule.
-
Enter a brief Description of the update, including how or why it is applied.
-
Use the Calendar ( ) to choose the Start Date and End Date for the scheduled change to be in effect. To create an open-ended change, leave the end date blank.
{width="600" modal="regular"}
note note NOTE The start and end date/time is determined by the default Admin panel date/time and time zone, not by the time zone of a particular website. Consider the time zone of the website to properly determine start and end times. Create separate rules for websites in different time zones that need to start and/or stop at specific local times. -
-
Scroll down to the Rule Information section and change the rule as needed.
You can schedule changes for any rule parameter, including the websites (scope)/customer groups for the rule, conditions of the rule, and actions applied by the rule. For more information, see Creating a Catalog Price Rule.
note note NOTE If you change to any of the rule information parameters, make sure that the Status is set correctly. If you want the change to result in an actively applied rule, the status should be Active
. -
When complete, click Save.
The scheduled change appears at the top of the page, with the start and end dates of the campaign.
Edit a scheduled rule change
-
In the Scheduled Changes box at the top of the page, click View/Edit.
-
Make any changes necessary to the scheduled update.
note note NOTE If a campaign is linked to more than one catalog price rule, the campaign can be edited only from the Content Staging Dashboard. -
Click Save.
Preview the scheduled rule change
-
In the Scheduled Changes box at the top of the page, click Preview.
The Preview opens a new browser tab that loads your storefront with the applied scheduled change. Navigate to a product that is affected by the change.
{width="600" modal="regular"}
-
In the upper-left corner of the Preview window, click Calendar.
The calendar detail shows other campaigns that are scheduled for the same day. Each record in the list is a separate rule update.
{width="600" modal="regular"}
-
To preview a different day or time, click the Date & Time calendar and do the following:
-
Choose a different date and/or time.
-
Click Preview.
-
-
To return to the calendar, click Calendar in the header of the Preview page.
From here, you can do the following:
Share a Link to the Preview
To share a link to the store preview with your colleagues, click Share. Copy the link to the clipboard and paste it into the body of an email message.
note note NOTE An Admin user account is required to see a shared preview. If your role has access to create an Admin user account, you must create the account for a new user before sharing. Change the Scope of the Preview
To see scheduled changes for different store views, click Scope in the header of the Preview page. Choose the website, store, or store view that you want to preview.
-
If necessary, return to the calendar and click View/Edit in the Action column to open another scheduled update.