Schedule an update to a product

  1. From the Products grid, open a product in edit mode.

  2. In the Scheduled Changes box at the top of the page, click Schedule New Update.

    Schedule new update

  3. With the Save as a New Update option selected, Set the basic parameters for the update:

    • For Update Name, enter a name for the new content staging campaign.

    • Enter a brief Description of the update and how it is to be used.

    • Use the Calendar ( Calendar icon ) tool to choose the Start Date and End Date for the campaign.

      To create an open-ended campaign, do not specify an end date (leave blank). For this example, the campaign is scheduled to begin at the stroke of midnight for the new year, January 1, 2021 at 12:00 AM PST.

      For a price rule campaign that was created without an end date, an end date cannot be added later. In such a case, it is necessary to create a campaign and set the start date to the date you want the old campaign to end and the new one to start. On that start date, the old campaign ends and the new campaign begin as defined.

      Scheduling a product update

      NOTE
      Campaign start date and end date must be defined by using the default Admin time zone, which is converted from the local time zone of each website. For example, when you have multiple websites in different time zones, but you want to start a campaign based on a US (default) time zone, you must schedule a separate update for each local time zone. In this case, set Start Date and End Date as converted from each local website time zone to the default Admin time zone.
  4. Scroll down to Price and click Advanced Pricing.

  5. Enter a Special Price for the product during the scheduled campaign and click Done.

  6. When complete, click Save.

    The scheduled change appears at the top of the product page, with the start and end dates of the campaign.

    Scheduled change

Edit the scheduled change

  1. In the Scheduled Changes box at the top of the page, click View/Edit.

  2. Make any changes necessary to the scheduled update.

  3. Click Save.

Preview the scheduled change

In the Scheduled Changes box at the top of the page, click Preview.

The preview opens a new browser tab, and shows how the product appears during the scheduled campaign.

NOTE
A staging preview for a scheduled update always starts from the default store view, which emulates the customer’s experience of navigating through the staging update campaign.

For more information about using the preview content tools to change the date and scope of the preview, see Previewing a Campaign. You can also share a link to the store preview with your colleagues.

Next pageStaging dashboard