Scheduler scheduler

The Scheduler is a persistent task that activates its transition at the times specified by its schedule.

The Scheduler activity should be considered as a scheduled start. The activity positioning rules within the chart are the same as for the Start activity. This activity must not have an inbound transition.

Best practices best-practices

Restart workflow after changing scheduler timing - When changing the scheduled time of the Scheduler activity, it is important to restart the workflow. This ensures that the workflow will execute at the updated times. Without restarting, the workflow will continue to execute according to the old schedule.

Limit Scheduler frequency - Avoid scheduling workflows to run more frequently than every 15 minutes. Running them more often can degrade system performance and result in database congestion.

Use one Scheduler per branch - Each branch of your workflow should only have one Scheduler activity. For more information on best practices for using activities in workflows, refer to the Workflow best practices page.

Prevent workflow concurrent executions - If a workflow is triggered by a scheduler, be mindful that multiple instances of the workflow could be running at the same time. For example, if a scheduler triggers the workflow every hour, but the workflow execution takes more than an hour, you could end up with overlapping executions.To avoid this, consider setting up checks to prevent multiple simultaneous executions. Learn how to prevent simultaneous multiple workflow executions.

Account for delayed transitions - Transitions triggered by the scheduler might be delayed if the workflow is executing long-running tasks (like imports), or if the wfserver module has been stopped temporarily. To mitigate this, restrict the activation times of the scheduler to ensure tasks run within a defined time window.

Configuring the Scheduler activity configuring-scheduler-activity

The scheduler defines the activation schedule of the transition. To configure it, double-click the graphical object, then click Change…

Scheduler activity dialog with the Change button used to define the execution frequency

A wizard lets you define the frequency and validity period of the activity. The configuration steps are as follows:

  1. Select the activation frequency and click Next.

    Schedule editing wizard, Select frequency type: Several times a day, Daily, Weekly, Monthly, Once

  2. Give the activation times and days. The parameters for this step depend on the frequency selected in the previous step. If you choose to launch the activity several times a day, the configuration options will be as follows:

    Schedule editing wizard, Many times a day: Hour selection on selected hours and Day selection with weekdays

  3. Define the validity period of the schedule, or specify how many times it will be executed.

    Schedule editing wizard, Validity period: Permanent validity, Valid from and To dates, or Maximum number of iterations

  4. Check the configuration and click Finish to save.

    Schedule editing wizard, Summary: schedule description and list of next launch times, with the Finish button