Read more about Data Workbench’s End-of-life announcement.
Information about adding and changing metrics.
To add a new metric
Right-click the label or an element of the metric, click Add Metric > < metric name>. The metric is added to the right of the metric that you selected originally.
The following example shows the Average Score metric by the Movie dimension (in the top table) and the same table with a second metric, Average Score Error, added to the table.
To change a metric