Programmer kickstart guide programmer-kickstart-guide

NOTE
The content on this page is provided for information purposes only. Usage of this API requires a current license from Adobe. No unauthorized use is permitted.

Introduction prog-kickstart-guide-intro

Welcome to Adobe Pass Authentication for TV Everywhere. We look forward to working with you.

NOTE
This is the Kickstart Guide for Programmers (content providers). If you are with a Multi-channel Video Programming Distributor (MVPD), please be sure to see the MVPD kickstart guide.

Adobe Pass Authentication contacts:

  • Support - for all questions, incidents or feature requests, tve-support@adobe.com
  • An Enablement contact will be assigned to your project by the time of your project kickoff.

The following information outlines some important first steps to get us off to a solid and efficient start. The goal is to provide an explanation and expectation about how we will work with partners to achieve integrations. Please note the “you will provide” / “Adobe will provide” sections below for each item. These are listed by way of a checklist, or guide as we work through the project.

This document assumes that programmers are signed up to work with a chosen MVPD partner.

Release schedule release-schedule

The Adobe sprint development cycle is planned out so that you can see when our releases are scheduled and how each release gets promoted through our development system.

After each sprint is complete it is available for QE, or to see new implementations on our UAT server.

Approximately every 6 weeks a release will be made to the Adobe Pre-Qualification server. (This is the server where we hold our proposed next release while carrying out final QE.) These builds will include all work completed in sprints since the last drop. A two week QE window is available at this time for partners to test this release.

Assuming no critical issues arose during the preceding two-week testing window, the release will be promoted to live production. This means that the integration will be available in the Adobe Release environment, but partners choose when they make the release public.

Support documentation supp-doc

Adobe will provide:

  • Deployment Guide: https://tve.zendesk.com/entries/498741-tve-deployment-guide
  • Access to our Zendesk customer support system. This is also where you can find samples, information and video tutorials on some of the processes. In order to access this document on Zendesk, along with other documents posted there, you will have to register and create an account at https://tve.zendesk.com/home. There is no limit to the amount of users you can register. You able to see and share comments on any filed ticket. All support questions should be addressed to tve-support@adobe.com.
  • Programmer Integration Guide
  • Media Token Verifier Library: https://tve.zendesk.com/entries/471323-media-token-validator-library.

Test environment setup test-env-setup

Adobe will first set you up with the Adobe test site, where Adobe acts as an MVPD for test purposes. Your team can then set up a test website that calls the Adobe API. Use the default MVPD selector, and select “Adobe” as the idP.

You will provide:

  1. Requestor ID. This is a string that will uniquely identify the brand of the website or the application that is making requests to Adobe Pass Authentication. The string itself is arbitrary but needs to be agreed between Adobe and the Programmer
  2. Channel information. This is a set of strings that identifies the content channel(s) being requested by the requestor ID. In many cases the channel and the Requestor ID are the same. You may however have multiple channels of content that can be requested by the same ID. Channel name strings should correspond to the cable TV channels. Some MVPDs will validate this value over the AuthN and/or AuthZ protocol.
  3. Domain names (to be allowed for that requestor ID). This will be a list of actual domain names that will be listed by Adobe to accept the requestor ID. This ensures that only your approved domains have access to Adobe Pass Authentication with your metadata. NOTE: domain names valid for production may be different for testing/staging and both should be provided and identified.

Adobe will set up the account and Adobe will provide:

  • Login and password to access the test site

Setup with MVPD setup-mvpd

This section describes what you need when you migrate from the Adobe test site to work with an MVPD.

You will provide (via MVPD):

  • Two sets of credentials:

    • AuthN + AuthZ : login/password for a user which is authenticated and authorized
    • AuthN + Non-AuthZ : login/password for a user which is authenticated but not authorized
  • Resource ID. This is a specific content identifier that will be validated with an MVPD over the AuthZ protocol. This can be at the channel, show, episode, or asset level; it should be agreed upon with your MVPD.

Adobe Pass Authentication supports an MRSS-based metadata schema which means that Resource IDs can be as specific as needed, and can include identifiers that may be unique to a specific MVPD.

NEW MVPD integration: It is important to remember that your chosen MVPD plays an integral part in completing any integration. Adobe needs to write code for each MVPD according to their specs. Until these steps are complete, you will not be able to select that MVPD from the dialog, or complete your product testing. Adobe needs to schedule this work in advance to fit with the next available sprint. (For current schedule information, refer to the Release Calendar.)

Existing MVPD integrations: If your chosen MVPD is already set up with Adobe then the connectivity steps should be much simpler (faster), and often connectivity can be achieved by way of configuration changes.

NOTE
The MVPD will STILL have to enable the Programmer, and sign off on any relevant business deals.

QE with MVPDs: All integrations will involve joint QE, and since the end user is ultimately a customer of the MVPD, many have set test cycles prior to pushing “live”. Since this involves scheduling of MVPD resources, this is a potential area for delay.

recommendation-more-help
3f5e655c-af63-48cc-9769-2b6803cc5f4b