ACSD-51358: Schedule updates are missing

The ACSD-51358 patch fixes the issue where the changes in scheduled update without an end date lead to removing other scheduled updates on the same entity. This patch is available when the Quality Patches Tool (QPT) 1.1.35 is installed. The patch ID is ACSD-51358. Please note that the issue is scheduled to be fixed in Adobe Commerce 2.4.7.

Affected products and versions

The patch is created for Adobe Commerce version:

  • Adobe Commerce (all deployment methods) 2.4.5-p1

Compatible with Adobe Commerce versions:

  • Adobe Commerce (all deployment methods) 2.4.5 - 2.4.6-p1
NOTE
The patch might become applicable to other versions with new Quality Patches Tool releases. To check if the patch is compatible with your Adobe Commerce version, update the magento/quality-patches package to the latest version and check the compatibility on the Quality Patches Tool: Search for patches page. Use the patch ID as a search keyword to locate the patch.

Issue

The changes in scheduled update without an end date lead to removing other scheduled updates on the same entity.

Steps to reproduce:

  1. Create a scheduled update without the end date (update 1).
  2. Create new scheduled update with same start date as first update, but add the next day, and the end date (update 2).
  3. Edit scheduled update created on step 1 (update 1) and the save changes.

Expected results

The (update 2) should remain in the schedule update list when (update 1) is edited.

Actual results

The (update 2) was removed from the schedule update list when (update 1) is edited.

Apply the patch

To apply individual patches, use the following links depending on your deployment method:

To learn more about Quality Patches Tool, refer to:

For info about other patches available in QPT, refer to Quality Patches Tool: Search for patches in the Quality Patches Tool guide.

recommendation-more-help
8bd06ef0-b3d5-4137-b74e-d7b00485808a